ESC Group

Jul 18, 20171 min

ESC Trench Boxes Supply to the Construction of Foul Drainage Networks Project at Kalba, Fujairah, UA

Updated: Aug 28, 2021

SC is proud to announce that National Contracting & Transport Company ( NCTC ) have placed second order for additional 44 nos. of Trench Boxes. The total no. of Trench Boxes delivered now are 84 nos. (64 Base Boxes - dimension of 4.0m length x 2.4m Height x 1.5m Spreaders and 20 Top Boxes - 4.0m length x 1.6m Height x 1.5m Spreaders ) to cover their excavation depth ranging from 2.0m to 4.5m height for their manhole and pipe laying works on their Construction of Foul Drainage Networks Project at Kalba, Fujairah, UAE.

    62
    0